top of page

Architectural Control Process

The River Crossing Architectural Control Committee (RCACC) has processes to help residents navigate home updates. These processes are in place to maintain the consistency and quality of our homes in River Crossing. 

Purpose

To assure that additions or structural modifications (hereinafter referred to as New Development) within the River Crossing plats harmonize with the (1) surrounding structures, (2) surrounding natural and built environment, and (3) aesthetic character of other homes in the plat.

Jurisdiction 

The RCACC is responsible for the review and subsequent determination of proposals for New Development, further defined by:

​

  • Residences—including but not limited to existing structure alterations or replacements (new doors, windows, roofing, siding, etc.), room additions, and exterior paint color changes to nonapproved colors.

  • Accessory Structures—including but not limited to garden sheds, tool sheds, playhouses, playground equipment, fences, retaining walls (using materials larger than “one man”), satellite dishes, or antennae.

  • Recreational Facilities—including but not limited to hot tubs, spas, fixed and mobile basketball courts, sports courts, swimming pools, bathhouses, or other exterior recreational facilities of a permanent nature.

  • Significant Landscaping—including but not limited to water features (large fountains, waterfalls), yard re-landscaping projects, and tree removals.

​​

The RCACC shall have the authority to establish aesthetic standards for evaluating proposals. The RCACC may decline to approve any proposal that (1) fails to meet established standards and any other aesthetic standards promulgated by the RCACC and (2) adversely impacts nearby properties and other common areas or is of a temporary or nonpermanent nature.

Proposal Requirements

All proposals requiring review by the RCACC must be submitted 21 days before the start of the project. Owners/residents must use the Online ACC Form or the PDF Form on the rivercrossinghoa.org website. All proposals must include:

​

The name of the owner, the address of the owner submitting the proposal, and the following information about the proposal as applicable:

  • The address and lot number

  • Location of the structure on the lot

  • Elevation of the structure, referencing the existing and finished grade

  • General design

  • All exterior finish materials, including color, grade, and roofing materials

  • Landscaping plans (including both front and back), and

  • Other information may be required by the RCACC and/or the City of Mill Creek (building permits) to determine whether the proposal conforms to the standards articulated in the CC&Rs and the Architectural and Aesthetic standards employed by the RCACC in evaluating New Development proposals.

Decision Process

Owners shall act objectively and responsibly when applying. The RCACC shall act responsibly, consistently, and with the purpose of our calling, utilizing the established process when making decisions on plans submitted by various owners for consideration.

​​

  • The owner must give written notice to all adjacent owners describing and locating their proposal. Note that the definition of adjacent includes both common property lines (physical) and areas where the New Development is readily visible (visual).

  • The owner must give the RCACC an affidavit that the owner has given proper notice with the date of such notice.

    • Objecting owners must file a written objection with the RCACC within 21 days of receipt of the notice from the requesting owner.

  • The owner submits the proposal to the RCACC using the online form or the PDF form found on the rivercrossinghoa.org website.

  • RCACC has 21 days to review homeowner proposals including fact-finding, determination, and owner notification.

Process Flow

The River Crossing HOA ACC Process
bottom of page